Skip to main content

Near Miss

A sequence of events or conditions that could have resulted in a loss, the potential loss could be human injury, environmental damage, or negative business impact. 

Near miss may define the primary condition which may lead to an accident. or its a warning of an accident so to avoid an accident the primary conditions(near miss) to be eliminated by corrective actions.

Examples of near miss:
  1. Any event that leads to the implementation of an emergency procedure, plan or response and thus prevents a loss Eg.:- a collision is narrowly avoided; or a crew member double checks a valve and discovers a wrong pressure reading on the supply side
  2. Any event where an unexpected condition could lead to an adverse consequence, but which does not occur. Eg.:- a person moves from a location immediately before a crane unexpectedly drops a load of cargo there, or a ship finds itself off-course in normally shallow waters but does not ground because of an unusually high spring tide
  3. Any dangerous or hazardous situation or condition that is not discovered until after the danger has passed. Eg.:- a vessel safely departs a port of call and discovers several hours into the voyage that the ship's radio was not tuned to the Harbor Master's radio frequency; or it is discovered that ECDIS display's scale does not match the scale, projection, or orientation of the chart and radar images.

Barriers of reporting near miss:
  1. In most of the cases near misses are known to individual only who decides it reported or not.
  2. Another factor is the fear of being blamed, disciplined, embarrassed, or found legally liable.
  3. Unsupported company management attitude
  4. Insincerity about addressing safety issues
  5. All these barriers can overcome by:
  • Encouraging a “just culture” in the company which covers near-miss reporting
  • Assuring confidentiality for reporting near-misses, through company policy
  • Ensuring that investigations are adequately resourced.
  • Following through on the near-miss report suggestions and recommendations.


Near miss investigation process:
1. Minimum information gathered about near miss
  • Who and what was involved?
  • What happened, where, when, and in what sequence?
  • What were the potential losses and their potential severity?
  • What was the likelihood of a loss being realized?
  • What is the likelihood of a recurrence of the chain of events and/or conditions that led to the near-miss?
2.Date, time, location, cause, weather condition
3.Gathering near miss information
4.Analyzing information
5.Identifying casual factors
6.Developing and implementing the recommendation
7.Completing the investigation

Completing the investigation:
  1. Completion of the investigation process requires the generation of a report, either brief or extensive, depending on the depth of analysis performed and the extent of risk.
  2. The ultimate objective of near-miss reporting and investigating is to identify areas of concern and implement appropriate corrective actions to avoid future losses. To do so requires that reports are to be generated, shared, read, and acted upon. Companies are encouraged to consider whether their report should be disseminated to a wider audience.
  3. It may take years for safety trends to be discerned, and so reporting must be archived and revisited on a timely basis. Near-miss reports should be considered along with actual casualty or incident reports to determine trends. There should be consistency in the identification and nomenclature of causal factors across near-miss and casualty/incident reports

Comments

Popular posts from this blog

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp

Bilge Injection Valve

Bilge Injection is a valve that enables the engine room bilges to be pumped out directly overboard in the event of an emergency such as flooding. The valve is normally fitted to the end of a branch connection with the main sea water suction line. This enables large main seawater cooling pumps to be used as a bilge pump in an emergency. Emergencies like fire and flooding involve the use of seawater. If there is a fire, seawater is the biggest resource of water available in the sea. Similarly, if it involves flooding of the engine room, cargo spaces or any other place on the ship for that matter; you would again require pumping the sea water out of the ship. In both these cases, you require pumps.  There are two valves in close proximity namely main injection valve and bilge injection valve. Both of them have their own independent controls. The diameter of the bilge injection valve is kept nearly 66% of the main valve diameter which draws water directly from the sea through the