Skip to main content

What checks are to be made before Departure from a port ?



1. Ensure that the main and auxiliary machinery is in working condition. If any machinery was opened up for overhaul, it has been boxed up and tried out for satisfactory operation.

Ensure fuel oil settling and service tanks are full. 

Main air receiver is pressed up and drained of water.

Start and take on load second generator. 

Start all the pumps required for main engine and check for correct pressure and flow as required.

Start lub.oil purifier if not already running.


2. Following Controls have to be tested
(a) Steering gear to be tried out with both motors individually,
movement of the hydraulic rams & rudder stock is smooth and not jerky (jerky movement indicates air in the system), there is no leakage of oil from telemotor receiver or the rams, any greasing points have been greased, helm indicators on bridge and in steering
compartment are showing same degree of helm, and the communication between bridge/ steering compartment/engine
room is in order.

(b) Engine room telegraph to be tried out for normal functioning.

(c) Ship’s whistle to be tried out.

3. Main Engine to be turned on turning gear after obtaining
propeller clearance from duty officer. While turning the engine keep indicator cocks open and manually operate the cylinder
lubricators to lubricate the cylinder liners. Disengage turning
gear.

4. Blow through the engine on air after obtaining propeller clearance to turn the engine on air. Look for any water coming out from any unit through indicator cocks.

5. Shut the indicator cocks and try out the engine on fuel in both ahead and astern direction. Before giving controls to the wheelhouse.

Comments

Popular posts from this blog

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp

Bilge Injection Valve

Bilge Injection is a valve that enables the engine room bilges to be pumped out directly overboard in the event of an emergency such as flooding. The valve is normally fitted to the end of a branch connection with the main sea water suction line. This enables large main seawater cooling pumps to be used as a bilge pump in an emergency. Emergencies like fire and flooding involve the use of seawater. If there is a fire, seawater is the biggest resource of water available in the sea. Similarly, if it involves flooding of the engine room, cargo spaces or any other place on the ship for that matter; you would again require pumping the sea water out of the ship. In both these cases, you require pumps.  There are two valves in close proximity namely main injection valve and bilge injection valve. Both of them have their own independent controls. The diameter of the bilge injection valve is kept nearly 66% of the main valve diameter which draws water directly from the sea through the