What is Ballast Water Management Plan?


In order to reduce the harmful effects on the marine environment that are spread through aquatic micro organisms transferred from one area to another through ballasting operations of the ship, the International Maritime Organization (IMO) adopted a convention in order to control and manage ships ballast and sediments ion on 13th February 2004. Which entered into force on 8 September 2017.

Port state authorities from around the world implemented their own requirements for ballasting and de-ballasting operation for ships sailing in their terrestrial water.

To simplify the requirement of the control of ballast water problem, a “ballast water management plan” was introduced which was to be used and implemented on board sailing vessels entering international waters.

Contents of Ballast Water Management Plan:
The ballast water management plan includes the following:
  • International rules and regulations for different port state controls all over the world.
  • Location of ports providing shore discharge facility of sediments and ballast water.
  • Duties of the personnel on board for carrying out ballast operation.
  • Operational procedure along with the method to be used for ballasting.
  • The locations at different coastal water for ballast exchange should be mentioned in the plan.
  • Sampling point and treatment method should be given in the ballast water management plan.


Record of the ballast water exchange with all the following data to be noted:


  • Date of the operation
  • Ship’s ballast tank used in the operation.
  • Temperature of the ballast water.
  • Salinity of the ballast water in PPM (salt content in parts per million).
  • Position of the ship (latitude and longitude).
  • Amount of ballast water involved in operation.
  • All the records entered must be signed by a responsible officer (normally chief officer).
  • Master is overall in-charge of the operation and he will also acknowledge the ballast/ de-ballast operation by signing the BMP log.
  • Date and identification of the tank last cleaned.
  • If there is accidental discharge of ballast exchange it must be entered and signed. Same information is to be given to concerned port state authority.
Advantage of ballast water management plan:
With the help of a proper ballast management plan and some additional information, operational delays can be avoided which will help to save time and money.
Reporting for requirements of different post state authority is simplified. And the most important of all is that a safe ballast exchange can be carried out anywhere in the world.

Comments

Popular posts from this blog

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Why do we blow through engine before starting ?

The engine is blown through on air before starting it : a) To Blow out through indicator cock any residual exhaust gas or     other products of combustion trapped inside the cylinder after     shutting the engine. b) To check if any jacket cooling water from cylinder head or     turbocharger or any other source, has leaked while the engine          was shut and collected on top of piston. If while blowing                  through, water comes out of indicator cock or relief valve, we          need to investigate and rectify the fault before starting the                engine. It is imperative that the engine is blown through before        starting. There have been cases where the generator engine has        been started from control room without bothering to blow     through first, and water collected on top of piston has resulted in      a bent connecting rod and broken piston.( Reason – water can          not be compressed )

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp