1. Ensure that the main and auxiliary machinery is in working condition. If any machinery was opened up for overhaul, it has been boxed up and tried out for satisfactory operation. Ensure fuel oil settling and service tanks are full. Main air receiver is pressed up and drained of water. Start and take on load second generator. Start all the pumps required for main engine and check for correct pressure and flow as required. Start lub.oil purifier if not already running. 2. Following Controls have to be tested (a) Steering gear to be tried out with both motors individually, movement of the hydraulic rams & rudder stock is smooth and not jerky (jerky movement indicates air in the system), there is no leakage of oil from telemotor receiver or the rams, any greasing points have been greased, helm indicators on bridge and in steering compartment are showing same degree of helm, and the communication between bridge/ steering compartment/engine room is in order. ...
Please consider us Donating to keep this site alive thank you