Skip to main content

Topping up of Oil in Refrigerator Compressor

In a refrigeration compressor, oil and gas exist together in the compressor crankcase, even when the compressor is cut off or stopped there exist a positive pressure in the compressor crankcase. 

Hence the oil top up in a fridge compressor is done with a hand pump.

  • Compressor crankcase has an oil charging valve,
  • Oil charging hand pump is connected to this charging valve,
  • Air is purged from the hand pump discharge hose and the union is tightened on the charging valve,
  • By using the hand pump oil is pumped from a clean container to the crankcase,
  • Oil level is observed in the gauge glass as the pumping is carried out,
  • Pumping is stopped when the gauge shows about half full.
  • Charging valve is closed and the pump is removed.

Comments

  1. You're amazing since the article you've written is both engaging and informative. Thank you for sharing that. Keep up the good work. apple charging station

    ReplyDelete
  2. Nice info, I am very thankful to you for sharing this important knowledge. This information is helpful for everyone. Read more info about Refrigerator Prices In Kenya So please always share this kind of information. Thanks.

    ReplyDelete
  3. You wrote this post very carefully.Air Conditioner For Sale Online Pakistan The amount of information is stunning and also a gainful article for us. Keep sharing this kind of articles, Thank you.

    ReplyDelete

Post a Comment

Popular posts from this blog

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Why do we blow through engine before starting ?

The engine is blown through on air before starting it : a) To Blow out through indicator cock any residual exhaust gas or     other products of combustion trapped inside the cylinder after     shutting the engine. b) To check if any jacket cooling water from cylinder head or     turbocharger or any other source, has leaked while the engine          was shut and collected on top of piston. If while blowing                  through, water comes out of indicator cock or relief valve, we          need to investigate and rectify the fault before starting the                engine. It is imperative that the engine is blown through before        starting. There have been cases where the generator engine has        been started from control room without bothering to blow     through first, and water collected on top of piston has resulted in      a bent connecting rod and broken piston.( Reason – water can          not be compressed )

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp