Skip to main content

MEO Class 1

  • Tanker vetting inspection
  • Crank web deflection taken by junior is found to be high.what action?
  • Sea trial analysis
  • MLC articles
  • Bulk carrier inspections
  • One ME unit is cut off , what are the limitations ?
  • Convention and protocol
  • Any crisis faced on your ship during your tenure on board and explain in terms of management
  • difference VED and ABC ( inventory management )
  • draw propeller curve and equation and explain.
  • why PSC is required in one line.
  • what is additional survey .
  • if you are ship owner when will you prefer to do Bareboat chartering of your ship ??
  • Introduction of ship sailed & any management level experience.
  • Types of chartering & fob.
  • After liner & piston renewal, what all to observe.
  • new ship to be taken in operation what all to do.
  • How to motivate people on board.
  • What is LD clause.
  • Importance of psc.
  • Marpol annex vi reg 12 to 19.
  • Flooding criteria.
  • Intact stability.
  • Who can apply for rpsl.
  • CLC convention with date and amendments.
  • Information regarding eca area.
  • Noise code
  • Interpersonal conflict resolving procedure.
  • Vetting , chief engineer duties
  • AFS paints and measuring thickness.
  • TMSA audit, difference between tmsa and sire.
  • Salvage, dates, definition from Ms act, types .
  • Me scavenge space inspection correct time to inspect , why and salient points in the report.

Comments

Popular posts from this blog

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Gravity Disc

Oils containing water can only be de-watered in a perfect manner if the bowl is accurately adjusted to the difference in densities of oil and water. The gravity disc with proper inner diameter i.e. with the diameter that corresponds to the difference in densities of the oil-water mixture to be treated should, therefore, be inserted in the bowl, This disc can be chosen from the set of disc provided with the separator. The inner diameter of the disc to be chosen can be determined by:  Calculation   Experiment The general rule is : Small diameter gravity disc when treating heavy oil Large diameter regulating ring when treating light oil Determining the size of gravity disc by calculation: For a given separating temperature, the inner diameter of the gravity disc and if the desired density of the oil can be determined from the diagram, provided that the density of the oil at a temperature ranging 15℃ and 90℃ is known. For example; Given: Density of oil at 20℃            ρ oil