Skip to main content

- You are joining as CE. How will you come to know ISM is effectively implemented.
- Assignment of loadline.
- When class notation is given. What all class notation do you have.
- what are green house gases?
- vetting and port state control difference.
- In the way to engine room collision has taken action as chief engineer.
- As CE what repair will you suggest to carry out in Drydock
- In a voyage sudden increase in fuel consumption reason.how will you find the fault.
- What is CLC ? What is the definition of persistent oil.
- What is the SCOPIC clause?
- Assignment of loadline.
- What is CIC by PSC?
- How will you implement ism on chief engineer on a new ship
- How will you prepare for seq survey
- How will you prepare loadline survey
- Aux eng crankshaft broken how will you prepare the report for H and M surveyor
- LO consumption high ..what checks
- Drydock preparation
- You have fuel which is not compliant , and you have to leave port and no fuel is available , what will you do as a chief engineer
- During grade change from propane to ammonia, what will you check as CE
- If icing in cargo tank what will be your action
- What are the difficulties faced with low sulphur fuel, what you do
- What is the steel that is used for construction( for LPG tankers)
- LL survey, how u will prepare ship as Ce?
- Bunker dispute how u will handle as CE?
- bunker bimco clause etc.
- Collision in E/R how you will deal as Ce.
- How to asses ME is fit or not, actually he wanted ur practical approach as CE
- P & I? What all risk cover?
- scopic, article13,14 in detail
- Drydocking as Ce what all document u prepared for dock?
- OWS is not working just before two day of port arrival , what is ur action Ce?
- Main engine TC got a hole in exhaust side , how u deal with?
- Iopp survey is due. Preparations as CE
- SEQ survey is due. Preparations as CE.
- ESP
- Condition Monitoring
- Intelligent Engine
- Vessel on a short run and unable to maintain crew rest hours.
- Company has taken over a vessel. Now the company is putting pressure to immediately sail out for loading. Minimum checks as per CE.
- U join a new yard delivery ship, how will you implement isps code?
- how u ll prepared ur ship as Ce for upcoming LL survey?
- Grounding in way of engine room your action as chief engineer?
- regarding how you know about damage?
- Esp? What is it? Why it came? Since I done only container ships
- You departing port with non-complaint fuel for next arrival port, your actions as CE.
- You take over 2nd hand ship and superintendent telling you to sail on short notice, what all minimum checks you carried out as CE?
- Marpol Annex 6 survey is coming up, how you prepare your ship for the survey as CE?
- 8.5psc detainable deficiency, 5 ism related detainable deficiency.
- How you proceed for Nc? Who will close it?
- Hague Visby rules? if ship departs from country A which comply with rules and arrive on country B which not comply with HV rules then is it applicable for claim @port b.
- Your vessel going for recycling your preparation as CE? Convention for it? India ratified it or not?
Are you know the best it in Rajshahi.so click here Cba it
ReplyDelete