Skip to main content

Chronology for Sulzer RT-fl ex engines

 



1981:        First tests with electronically-controlled fuel injection on                    a Sulzer low-speed engine, using individual,                                        hydraulically-operated fuel injection pumps.

1990 Mar: World’s first multi-cylinder electronically                                            controlled uniflow two-stroke engine is started on the                          Winterthur test bed. Tested until 1995.

1993:         Project started to develop the Sulze RT-fl ex common-                        rail system.

1996:        Component testing began for the Sulzer RT-flex                                   common-rail system.

1998 Jun: Starting of the first Sulzer RT-flex fullscale engine on the                   Winterthur test bed. Sulzer 4RTA58T-B research engine.

2000 Feb:  Order for the first series-built Sulzer RT-flex engine.

2001 Jan:  Official shop test of the first series-built Sulzer RT-fl ex                     engine, the 6RT-fl ex58T-B at Hyundai H.I. in Korea.

2001 Sep: First RT-flex engine entered service. Sea trials of the bulk                   carrier Gypsum Centennial with a Sulzer 6RT-fl ex58T-B                   engine, of 11,275 kW.

2002 Oct: Official shop test of the first Sulzer RT-fl ex60C engine,                     at Wartsila's Trieste factory in Italy.

2003 Jan: Official shop test of Sulzer 7RT-fl ex60C at Hyundai H.I.                     in Korea.

2003 Jan: Sulzer RT-flex96C and RT-flex84T-D engine types                              announced.

2003 Mar: Sulzer RT-flex50 engine type announced.

2003 Mar: Official shop test of first Japanese-built RT-flex engine, a                    Sulzer 6RT-fl ex58T-B at Diesel United Ltd.

2003 Aug: Aframax tanker Sea Lady entered service in Japan with                        Sulzer 6RT-fl ex58T-B

2003 Nov: Multi-purpose carrier Wladyslaw Orkan entered service                      in China with Sulzer 7RT-fl ex60C.

2003 Nov: Reefer Carmel Ecofresh entered service in Portugal with                    Sulzer 7RT-fl ex60C.

2004 Jan: Sulzer RT-fl ex68T-B engine type announced.

2004 Feb: Multi-purpose carrier Chipolbrok Sun entered service in                     China with Sulzer 7RT-fl ex60C.

2004 Feb: Reefer Carmel Bio-Top entered service in Portugal with                     Sulzer 7RT-fl ex60C.

2004 Mar: Confirmed orders for RT-flex engines reach 100.

2004 Apr: Official shop test of first RT-flex96C engine, an 8RT-flex                    96C at HSD Engine Co Ltd in Korea.

2004 May: Multi-purpose carrier Chipolbrok Moon entered service                       in China with Sulzer 7RT-fl ex60C.

2004 May: Containership Safmarine Cameroun entered service in                        Germany with Sulzer 9RT-fl ex60C.

2004 Jun: Official shop test of world’s largest common-rail engine, a                   Sulzer 12RT-fl ex96C engine of 68,640 kW at Diesel                           United Ltd in Japan.

Comments

Popular posts from this blog

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Gravity Disc

Oils containing water can only be de-watered in a perfect manner if the bowl is accurately adjusted to the difference in densities of oil and water. The gravity disc with proper inner diameter i.e. with the diameter that corresponds to the difference in densities of the oil-water mixture to be treated should, therefore, be inserted in the bowl, This disc can be chosen from the set of disc provided with the separator. The inner diameter of the disc to be chosen can be determined by:  Calculation   Experiment The general rule is : Small diameter gravity disc when treating heavy oil Large diameter regulating ring when treating light oil Determining the size of gravity disc by calculation: For a given separating temperature, the inner diameter of the gravity disc and if the desired density of the oil can be determined from the diagram, provided that the density of the oil at a temperature ranging 15℃ and 90℃ is known. For example; Given: Density of oil at 20℃            ρ oil