Skip to main content

In an unfortunate incident of Main Engine Crank case explosion on your vessel, the main engine was badly damaged and two engine room personnel suffered serious injuries. Explain how you will present the vessel for subsequent inspections by P&I and H&M insurance companies with special emphasis on the records and documents required in each case to ensure that only genuine claims are honoured?

  1. In spite of taking all safety measures and following all correct procedures, sometimes unfortunate incidents do occur onboard a ship. These result in personal injuries and machinery damage.
  2. After every incident, investigations take place and insurance claims are raised. The insurance underwriters appoint damage surveyors who come on board and do their investigation. In the process of doing it, they ask for all the relevant documents.
  3. Suppose a main engine crankcase explosion has taken place on your ship in which the main engine was badly damaged and two engine room personnel suffered serious injuries.
  4. Now, you will have to present your vessel for subsequent inspections by P&I and H&M insurance companies. We will see step by step what all should be done after the incidence:-
a. Take care of persons injured:-
Since persons are seriously injured, give them first aid and ask for medical advice from a rescue center. Give the information to the owner and charterer and seek their advice. If the vessel needs to divert and make an emergency port of call take permission from the owner and charterer. But since the main engine is also badly damaged the vessel will need emergency towing. Give notice to agent and P&I correspondent at the nearest port. They will arrange for the salvage assistance. Enter in the port. Injured personnel to be transported to the hospital and later on, they can be repatriated. All the medical treatment given to the person should be chronologically documented in the medical book.

b. Reporting of incidence to:-
The incident should be reported to following without delay
Administration, Owner, Class, P&I correspondent, H&M broker & MAS center

c. Record keeping:-
Time, date, place and cause of the injury should be recorded. The evidence should be preserved and a witness statement should be taken. Write down all the important medical conditions and drugs that were given to the person. The persons injured were wearing PPEs or not. Take the statement of injured personnel as soon as possible if they are in the position of giving one. The most important report in the case of personnel injuries is the Master’s report. It is important evidence to judge whether the injury is work-related or not. Photos of sites and other evidence should be preserved.

d. Necessary documents and records required to honor only genuine claims In the case of P&I surveyor following documents should be kept ready:-
  1. Master statement of fact
  2. Witness report
  3. Injured person statement
  4. Communication with the owners, managers, medical advisors and authorities.
  5. Deviation report
  6. Photos of the place of evidence
  7. Medical report book relating to important medical conditions and all the drugs that were given to personnel
  8. Evidence showing personnel wearing PPEs
  9. Injured personnel familiarization with machinery form duly signed by him.
  10. Safety instructions explained.

In case of H&M surveyor following documents should be kept ready:-
  1. Chief engineer logbook and official logbook entry.
  2. Master’s and chief engineer’s statement
  3. Witness statement
  4. Engine room crew statements
  5. Main engine PMS records
  6. Main engine bearings last renewal and evidence showing that only genuine bearings were used.
  7. Main engine crankcase lubricating oil report
  8. Engine parameters at the time of incidence ( from logbook or data logger)
  9. Records showing last alarms and trips tried out ( from alarm logger)
  10. Compliance with manufacturer or service letter received recently

All the above documents will be required by the surveyor appointed by the H&M underwriter. After the survey, a damage survey report will be made. Now the main engine will be repaired. And after that claims will be settled. Depending upon the nature of insurance and the clauses inducted repairs can either be carried out by the owner and later the claims can be settled or repair tender can be floated by H&M underwriter only and they can carry out the repairs.

Comments

  1. If you want to pass your certification exam easily, get the updated pdf dumps of examdumps.in verified by specialists

    ReplyDelete
  2. The most updated pdf dumps offered by the PDFDumps.In for the effective preparation of certifications exam, these exam dumps are perfect to get highest score in exam

    ReplyDelete
  3. Your blog is really very nice informative and thorough. I read the blogs each time they are sent.


    PC Windows installation Victoria

    ReplyDelete

Post a Comment

Popular posts from this blog

Load Line & Why it is Important

Merchant ships have a marking on their hull know as the Plimsoll line or the Plimsoll mark, which indicates the limit until which ships can be loaded with enough cargo, internationally, the Plimsoll line on a ship is officially referred to as the international load line. Every type of ship has a different level of floating and the Plimsoll line on a ship generally varies from one vessel to another.  All vessels of 24 meters and more are required to have this Load line marking at the centre position of the length of summer load water line. There are two types of Load line markings:- Standard Load Line marking – This is applicable to all types of vessels. Timber Load Line Markings – This is applicable to vessels carrying timber cargo. These marks shall be punched on the surface of the hull making it visible even if the ship side paint fades out. The marks shall again be painted with white or yellow colour on a dark background/black on a light background.  The comp

Difference Between A, B & C-Class Divisions?

IMO Symbol A Class Division  IMO Symbol B Class Division  SOLAS has tables for structural fire protection requirement of bulkheads and decks. The requirements depend on the spaces in question and are different for passenger ships and cargo ships. The Administration has required a test of a prototype bulkhead or deck in accordance with the Fire Test Procedures Code to ensure that it meets the above requirements for integrity and temperature rise. Types of Divisions: "A" Class "B" Class "C" Class "A" Class: "A" class divisions are those divisions formed by bulkheads and decks which comply with the following criteria: They are constructed of steel or equivalent material They are suitably stiffened They are constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test. they are insulated with approved non-combustible materials such that the average tempera

Gravity Disc

Oils containing water can only be de-watered in a perfect manner if the bowl is accurately adjusted to the difference in densities of oil and water. The gravity disc with proper inner diameter i.e. with the diameter that corresponds to the difference in densities of the oil-water mixture to be treated should, therefore, be inserted in the bowl, This disc can be chosen from the set of disc provided with the separator. The inner diameter of the disc to be chosen can be determined by:  Calculation   Experiment The general rule is : Small diameter gravity disc when treating heavy oil Large diameter regulating ring when treating light oil Determining the size of gravity disc by calculation: For a given separating temperature, the inner diameter of the gravity disc and if the desired density of the oil can be determined from the diagram, provided that the density of the oil at a temperature ranging 15℃ and 90℃ is known. For example; Given: Density of oil at 20℃            ρ oil